Rudawa Water Treatment Plant

Back to main page

Rudawa Water Treatment Plant Cofnij Rozmiar czcionki Drukuj

Location
Kraków, Filtrowa 1
Phone: 12  63-74-169

A series of pipes connected to each other. In the middle, there is a bridge to cross.

About the Plant

  • commissioning date: 30 Sep. 1955
  • sources of water taken in: the Rudawa River
  • maximum output: 55 000 m3/24-hour
  • current production: 22 000 - 28 000 m3/24-hour
  • plant area: 7.2 ha
  • disinfection technology: CIO2 (chlorine dioxide)
  • number of consumers supplied:  approx. 200 000