Menu mobile

Raba Water Treatment Plant

Back to main page

Raba Water Treatment Plant Cofnij Rozmiar czcionki Drukuj

Location
Dobczyce, Nowowiejska 19
Phone: 12 27-11-140
Accelerator. Shot from the inside. Metal top and construction. In the center there is a platform.

About the Plant

  • commissioning date: 30 Sep. 1974
  • sources of water taken in: Dobczyce Reservoir
  • maximum output: 186 000 m3/24-hour
  • current production: 100 000 m3/24-hour
  • plant area: 29 ha
  • disinfection technology: UV radiation and sodium hypochlorite produced from kitchen salt in electrolysers
  • number of consumers supplied:  approx. 350 000